Wedge, lid or yoke sliders

Wedge, lid or yoke sliders

Nominal size: DN 50, DN 600
Working pressure: PN 16
Working temperature: 0 to 70 °C
Connection parameters: PN EN 1092-2, ISO 7005-2
Face-to-face length: ANSI B16.1, flange design EN 558, series 15, DIN 3202-1/F5, welding version EN 12 982, series 15, (DIN 3202-1/S8)
Materials: Monolith body - ductile iron EN-GJS-400-15 (GGG-40), Wedge – rubberized over the entire surface inside and out with EPDM rubber, Spindle (rising) – stainless steel with cylindrical thread, The screws connecting the upper flange to the body are stainless steel, recessed and covered with paraffin, EPDM rubber stuffing box seal
Stiffness test: pressure test with water, consistent with PN-EN 1074-1, PN-EN 1074-2. PN-EN 12266-1
Pressure test: pressure test with water, conforming to FM, UL, seal tightness: 1.5 x PN, body resistance: 2 x PN, torque investigation

Hi, my name is Marko. I am ready to assist you.

Ing. Marko Štofan

Application: Wedge, lid or yoke sliders are fittings designed to completely close or open the flow of the working medium. Their application is suitable for environments with water vapour, gas, water, oil, petroleum products or aggressive or non-aggressive substances.

Construction: yoke with a rising spindle, age with a non-rising spindle

Similar products

Explosion-proof electric multi-turn actuator SO 2-Ex

Type number: 042 Industry use: Oil and gas, Dust Enclosure protection: IP 66, IP 67 Switching-off torque: 7.5 to 50 Nm Operating time: 10 to 40 min−1
Type number: 042 Industry use: Oil and gas, Dust Enclosure protection: IP 66, IP 67

Explosion-proof electric multi-turn actuator UM 1-Ex

Industry use: Oil and gas, Dust Enclosure protection: IP 66, IP 68 Switching-off torque: 4 to 64 Nm Operating time: 10 to 80 min−1 Revolutions: 3.125 to 160
Industry use: Oil and gas, Dust Enclosure protection: IP 66, IP 68 Switching-off torque: 4 to 64 Nm

Explosion-proof electric mutli-turn actuator UM 2-Ex

Industry use: Oil and gas, Dust Enclosure protection: IP 66, IP 68 Switching-off torque: 18 to 100 Nm Operating time: 10 to 40 min−1 Revolutions: 3.125 to 160
Industry use: Oil and gas, Dust Enclosure protection: IP 66, IP 68 Switching-off torque: 18 to 100 Nm

Explosion-proof electric multi-turn actuator MO 3-Ex

Industry use: Oil and gas, Dust Enclosure protection: IP 66 Switching-off torque: 26 to 150 Nm Operating time: 16 to 95 min−1 Revolutions: 1 to 685
Industry use: Oil and gas, Dust Enclosure protection: IP 66 Switching-off torque: 26 to 150 Nm

Electric multi-turn actuator SO 2

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 68 Switching-off torque: 7.5 to 100 Nm Operating time: 10 to 40 min−1 Revolutions: 0.5 to 330
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 68 Switching-off torque: 7.5 to 100 Nm

Explosion-proof electric multi-turn actuator MO 3.4-Ex

Industry use: Oil and gas, Dust Enclosure protection: IP 66 Switching-off torque: 90 to 300 Nm Operating time: 10 to 80 min−1 Revolutions: 1.3 to 285
Industry use: Oil and gas, Dust Enclosure protection: IP 66 Switching-off torque: 90 to 300 Nm

Electric multi-turn actuator UM 1

Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 4 to 64 Nm Operating time: 10 to 80 min−1 Revolutions: 3.125 to 160
Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 4 to 64 Nm

Explosion-proof electric multi-turn actuator MO 3.5-Ex

Industry use: Oil and gas, Dust Enclosure protection: IP 66 Switching-off torque: 80 to 550 Nm Operating time: 25 to 45 min−1 Revolutions: 1.5 to 185
Industry use: Oil and gas, Dust Enclosure protection: IP 66 Switching-off torque: 80 to 550 Nm

Electric multi-turn actuator UM 2

Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 18 to 100 Nm Operating time: 10 to 40 min−1 Revolutions: 1 to 330
Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 18 to 100 Nm

Electric multi-turn actuator MO 3

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 25 to 250 Nm Operating time: 10 to 95 min−1 Revolutions: 1 to 685
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 25 to 250 Nm

Category products

Soft-sealing wedge sliders

Nominal size: DN 40, DN 1200 Working pressure: PN 10/16 Working temperature: 70 °C Connection parameters: EN 0192-2 with flanges type 21, shape B Face-to-face length: 15 – according to PN-EN 558+A1, F5 (DIN 3202), 14 – according to PN-EN 558+A1, F4 (DIN 3202)
Nominal size: DN 40, DN 1200 Working pressure: PN 10/16 Working temperature: 70 °C

Knife gate valves

Nominal size: DN 50, DN 1000 Working pressure: PN 10/16 Working temperature: 70 °C Connection parameters: PN EN 0192-2, DIN 2501 Materials: Monolith body - ductile iron EN-GJS-400-15 (GGG-40), Wedge – fully rubberized with antibacterial EPDM, NBR, Spindle - corrosion-resistant steel 1.4021 (13% Cr), O - rings - NBR, Spindle nut – forged brass
Nominal size: DN 50, DN 1000 Working pressure: PN 10/16 Working temperature: 70 °C

Wedge, lid or yoke sliders

Nominal size: DN 50, DN 600 Working pressure: PN 16 Working temperature: 70 °C Connection parameters: PN EN 1092-2, ISO 7005-2 Face-to-face length: ANSI B16.1, flange design EN 558, series 15, DIN 3202-1/F5, welding version EN 12 982, series 15, (DIN 3202-1/S8)
Nominal size: DN 50, DN 600 Working pressure: PN 16 Working temperature: 70 °C

An important fact of reliable operation is not only the correct design of fittings and servo drives, but also their subsequent care. With regular inspections and planned maintenance, you will prevent malfunctions and thus increase the reliability of the operation and extend its service life. For this purpose, the company REGADA also offers you comprehensive care of servo drives in your operation or just a selection from some of the listed services:

  1. Supervision during the first start-up of actuators in operation
  2. Connection and testing of actuators
  3. Connections and start-up of Rematic actuators - instruction
  4. Attaching the actuators to the valves and starting them
  5. Maintenance of actuators and periodic inspections
  6. Post-warranty repairs at the customer
  7. Post-warranty repair offer in Regada
  8. Training of service personnel
  9. Spare parts