Electric multi-turn actuator UM 2

Electric multi-turn actuator UM 2

Type number: 142
Industry use: Energy, Water, Industry
Enclosure protection: IP 66, IP 68
Switching-off torque: 18 to 100 Nm
Operating time: 10 to 40 min−1
Revolutions: 1 to 330
Weight: 20 to 24 kg
Ambient temperature: -60 to 55 °C
Flange size: F07, F10, G0
Mouting position: any
contact Configurator

Hi, my name is Marko. I will be glad to help you.

Ing. Marko Štofan

Standard equipment

  • Supply voltage:
    • 230 V / 50 Hz
  • Terminal board connection
  • 2 torque switches
  • 2 position switches
  • 2 additional position switches
  • Mechanical connection ISO 5210, flange size F10, shape B1, B2, B3, C
  • Mechanical connection ISO 5210, flange size F07, shape B1, B2, B3, B4
  • Space heater with thermal switch
  • Thermal protection of the electromotor
  • Local position indicator
  • Manual control
  • Enclosure protection IP 66

Additional equipment

  • Supply voltage:
    • 3x400 V, 3x380 V, 220 V / 50 Hz
    • 240 V, 120 V / 60 Hz
    • 24 V DC
  • Position transmitter:
    • potentiometer single/double, 1x100 Ω, 1x2000 Ω, 2x100 Ω, 2x2000 Ω
    • electronic position transmitter, active/passive, 2-wire/3-wire, 0/4 to 20 mA
    • electronic position transmitter, active/passive, 3-wire, 0 to 10 V
    • current CPT, active/passive, 2-wire/3-wire, 0/4 to 20 mA
    • current DCPT 3M, active/passive, 2-wire, 4 to 20 mA
  • Electric local control unit 
  • Gold coated contacs of microswitches
  • Mechanical connection:
    • ISO 5210, flange size F07, shape A
    • ISO 5210, flange size F10, shape A
    • ГOCT P 55510, shape AK, AČ, MK, MČ
    • DIN 3338, flange size G0, shape A, C, E
    • other non-standard
  • Enclosure IP 68

Similar products

Wedge, lid or yoke sliders

Nominal size: DN 50, DN 600 Working pressure: PN 16 Working temperature: 70 °C Connection parameters: PN EN 1092-2, ISO 7005-2 Face-to-face length: ANSI B16.1, flange design EN 558, series 15, DIN 3202-1/F5, welding version EN 12 982, series 15, (DIN 3202-1/S8)
Nominal size: DN 50, DN 600 Working pressure: PN 16 Working temperature: 70 °C

Knife gate valves

Nominal size: DN 50, DN 1000 Working pressure: PN 10/16 Working temperature: 70 °C Connection parameters: PN EN 0192-2, DIN 2501 Materials: Monolith body - ductile iron EN-GJS-400-15 (GGG-40), Wedge – fully rubberized with antibacterial EPDM, NBR, Spindle - corrosion-resistant steel 1.4021 (13% Cr), O - rings - NBR, Spindle nut – forged brass
Nominal size: DN 50, DN 1000 Working pressure: PN 10/16 Working temperature: 70 °C

Soft-sealing wedge sliders

Nominal size: DN 40, DN 1200 Working pressure: PN 10/16 Working temperature: 70 °C Connection parameters: EN 0192-2 with flanges type 21, shape B Face-to-face length: 15 – according to PN-EN 558+A1, F5 (DIN 3202), 14 – according to PN-EN 558+A1, F4 (DIN 3202)
Nominal size: DN 40, DN 1200 Working pressure: PN 10/16 Working temperature: 70 °C

Category products

Electric multi-turn actuator SO 2

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 68 Switching-off torque: 7.5 to 100 Nm Operating time: 10 to 40 min−1 Revolutions: 0.5 to 330
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 68 Switching-off torque: 7.5 to 100 Nm

Electric multi-turn actuator MO 3

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 25 to 250 Nm Operating time: 10 to 95 min−1 Revolutions: 1 to 685
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 25 to 250 Nm

Electric multi-turn actuator MO 3.4

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 100 to 350 Nm Operating time: 10 to 80 min−1 Revolutions: 1.3 to 285
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 100 to 350 Nm

Electric multi-turn actuator MO 3.5

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 84 to 550 Nm Operating time: 25 to 40 min−1 Revolutions: 1.5 to 185
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 84 to 550 Nm

Electric multi-turn actuator MO 4

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 120 to 500 Nm Operating time: 16 to 180 min−1 Revolutions: 1 to 685
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 120 to 500 Nm

Electric multi-turn actuator MO 5

Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 300 to 1000 Nm Operating time: 15 to 100 min−1 Revolutions: 1.25 to 500
Industry use: Energy, Water, Industry Enclosure protection: IP 67, IP 55 Switching-off torque: 300 to 1000 Nm

Electric multi-turn actuator UM 1

Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 4 to 64 Nm Operating time: 10 to 80 min−1 Revolutions: 3.125 to 160
Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 4 to 64 Nm

Electric multi-turn actuator UM 2

Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 18 to 100 Nm Operating time: 10 to 40 min−1 Revolutions: 1 to 330
Industry use: Energy, Water, Industry Enclosure protection: IP 66, IP 68 Switching-off torque: 18 to 100 Nm

An important fact of reliable operation is not only the correct design of fittings and servo drives, but also their subsequent care. With regular inspections and planned maintenance, you will prevent malfunctions and thus increase the reliability of the operation and extend its service life. For this purpose, the company REGADA also offers you comprehensive care of servo drives in your operation or just a selection from some of the listed services:

  1. Supervision during the first start-up of actuators in operation
  2. Connection and testing of actuators
  3. Connections and start-up of Rematic actuators - instruction
  4. Attaching the actuators to the valves and starting them
  5. Maintenance of actuators and periodic inspections
  6. Post-warranty repairs at the customer
  7. Post-warranty repair offer in Regada
  8. Training of service personnel
  9. Spare parts