Electric linear actuator STR 0PA-M

Electric linear actuator STR 0PA-M

Enclosure protection: IP 67, IP 68
Switching-off thrust: 360 to 4500 N
Operating speed: 5 to 40 mm/min
Operating stroke: 10 to 40 mm
Weight: 2.5 to 4.5 kg
Ambient temperature: -60 to 55 °C

Hi, my name is Marko. I will be glad to help you.

Ing. Marko Štofan

Standard equipment and functions with DMS3 control unit

  • Supply voltage:
    • 230 V / 50 Hz
  • Terminal board connection
  • Switching off in limit positions from position and from thrust
  • Thrust blocking in limit positions
  • Thrust blocking during the start
  • 2 freely programmable relays R1, R2 (Not valid for Profibus and Modbus)
  • Relay READY (Not valid for Profibus and Modbus)
  • Control by unified signal 0/4 - 20 mA, 4 - 12 mA, 12 - 20 mA, or 0/2 - 10 V (Not valid for Profibus and Modbus)
  • Control by permanent voltage (+24 V DC) - OPEN, CLOSE
  • Impulse control (inching duty) (+24 V DC) - OPEN, STOP, CLOSE
  • Timing mode / regime of operation
  • Safety function ESD (failure reaction)
  • Electronic position transmitter 4 to 20 mA passive (not for DMS3 in 2P version) (Not valid for Profibus and Modbus)
  • Output of failure messages
  • Space heater operated by control unit
  • Communication interface RS 232
  • Programme for parameterization setting a PC
  • Mechanical connection - pillars
  • Mechanical position indicator
  • Manual control
  • Enclosure protection IP 67

Additional equipment

 
  • Supply voltage:
    • 220 V, 24 V / 50 Hz
    • 240 V, 120 V, 110 V, 24 V / 60 Hz
  • Communication cable DB-9F/RJ45
  • Service handle
  • Enclosure protection IP 68

Similar products

Category products

Electric linear actuator STR 0PA-M

Enclosure protection: IP 67, IP 68 Switching-off thrust: 360 to 4500 N Operating speed: 5 to 40 mm/min Operating stroke: 10 to 40 mm Weight: 2.5 to 4.5 kg
Enclosure protection: IP 67, IP 68 Switching-off thrust: 360 to 4500 N Operating speed: 5 to 40 mm/min

Electric linear actuator STR 1PA-M

Enclosure protection: IP 67, IP 68 Switching-off thrust: 2900 to 10000 N Operating speed: 8 to 80 mm/min Operating stroke: 20 to 80 mm Weight: 8.5 to 10.9 kg
Enclosure protection: IP 67, IP 68 Switching-off thrust: 2900 to 10000 N Operating speed: 8 to 80 mm/min

Electric linear actuator STR 2PA-M

Enclosure protection: IP 67, IP 68 Switching-off thrust: 12500 to 25000 N Operating speed: 10 to 120 mm/min Operating stroke: 10 to 100 mm Weight: 17 to 21.5 kg
Enclosure protection: IP 67, IP 68 Switching-off thrust: 12500 to 25000 N Operating speed: 10 to 120 mm/min

Electric linear actuator ULR 1PA-M

Enclosure protection: IP 66, IP 68 Switching-off thrust: 2100 to 12500 N Operating speed: 10 to 80 mm/min Operating stroke: 10 to 80 mm Weight: 16 to 19.5 kg
Enclosure protection: IP 66, IP 68 Switching-off thrust: 2100 to 12500 N Operating speed: 10 to 80 mm/min

Electric linear actuator ULR 2PA-M

Enclosure protection: IP 66, IP 68 Switching-off thrust: 12000 to 25000 N Operating speed: 14 to 120 mm/min Operating stroke: 10 to 100 mm Weight: 26 to 34.2 kg
Enclosure protection: IP 66, IP 68 Switching-off thrust: 12000 to 25000 N Operating speed: 14 to 120 mm/min

Electric linear actuator MTR 3PA-M

Enclosure protection: IP 67 Switching-off thrust: 8000 to 36000 N Operating speed: 32 to 250 mm/min Operating stroke: 10 to 100 mm Weight: 28 to 47 kg
Enclosure protection: IP 67 Switching-off thrust: 8000 to 36000 N Operating speed: 32 to 250 mm/min

An important fact of reliable operation is not only the correct design of fittings and servo drives, but also their subsequent care. With regular inspections and planned maintenance, you will prevent malfunctions and thus increase the reliability of the operation and extend its service life. For this purpose, the company REGADA also offers you comprehensive care of servo drives in your operation or just a selection from some of the listed services:

  1. Supervision during the first start-up of actuators in operation
  2. Connection and testing of actuators
  3. Connections and start-up of Rematic actuators - instruction
  4. Attaching the actuators to the valves and starting them
  5. Maintenance of actuators and periodic inspections
  6. Post-warranty repairs at the customer
  7. Post-warranty repair offer in Regada
  8. Training of service personnel
  9. Spare parts